Ranavadi PSP

Study terms approved (ToR) (as of 15 July 2026) · Novarion Energy Pvt Ltd · Inside draft ESA

1,200MW

Not disclosedtrees to be felled

29.87ha of forest land

  1. MoU signed
  2. Study terms (ToR)
  3. Forest clearance
  4. Construction
  5. Operating
Forest (ha) 29.87 Documented“v. Land requirement: Forest Land : 29.87 ha”EAC 58th meeting minutes, 15 Jul 2026 (Ranavadi ToR, item 58.2), page81 · 15 July 2026
Total land (ha) 195.97 Documented“in Pune and Raigad districts of Maharashtra of an area of 195.97 ha by M/s Novarion Energy”EAC 58th meeting minutes, 15 Jul 2026 (Ranavadi ToR, item 58.2), page273 · 15 July 2026
Capacity (MW) 1,200 Documented“on 13.04.2026 to develop the 1200 MW Ranavadi Standalone Pumped Storage”EAC 58th meeting minutes, 15 Jul 2026 (Ranavadi ToR, item 58.2), page256 · 15 July 2026
Location18.1986°N, 73.5836°E (exact)Documented“18°10'50.34"N; Upper Reservoir : 73°35'01.06"E; 18°11'54.79"N.”EAC 58th meeting minutes, 15 Jul 2026 (Ranavadi ToR, item 58.2), page81 · 15 July 2026
DistrictPune, Raigad

Notes

  • Expert Appraisal Committee (EAC) The central committee of experts that recommends ToR and EC for river valley and hydro projects, including PSPs. More in glossary → 58th minutes (15 Jul 2026, item 58.2, proposal IA/MH/RIV/583992/2026): Terms of Reference (ToR) The list of studies an EIA must cover, set by the expert committee. Getting a ToR is the first clearance step, not a permission to build. More in glossary → recommended. 195.97 ha = 29.87 ha forest + 166.10 ha non-forest; Tamhini Wildlife sanctuary (WLS) and tiger reserve Protected areas under the Wild Life (Protection) Act. A tiger reserve has an inviolate core and a surrounding buffer. More in glossary → is the nearest protected area.
  • Inside the draft Western Ghats Ecologically Sensitive Area (ESA) About 56,825 sq km of the Western Ghats proposed for protection since 2014; still only a draft, reissued six times. More in glossary → ; the EAC asked for a revised layout with less forest.

Timeline

  1. · Clearance Documented #

    New project: EAC recommends ToR for 1,200 MW Ranavadi Pumped storage project (PSP) Two reservoirs at different heights: water is pumped up when power is cheap and released through turbines when power is needed. More in glossary →

    Details and documents

    Novarion Energy's Open loop A PSP with at least one reservoir on a river or stream, so it changes natural water flow. More in glossary → in Pune and Raigad needs 195.97 haDocumented“in Pune and Raigad districts of Maharashtra of an area of 195.97 ha by M/s Novarion Energy”EAC 58th meeting minutes, 15 Jul 2026 (item 58.2), page273 · 15 July 2026, of which 29.87 haDocumented“v. Land requirement: Forest Land : 29.87 ha”EAC 58th meeting minutes, 15 Jul 2026 (item 58.2), page81 · 15 July 2026 is forest, inside the draft Western Ghats ESA. The EAC asked for a layout with less forest.Documented“on 13.04.2026 to develop the 1200 MW Ranavadi Standalone Pumped Storage”EAC 58th meeting minutes, 15 Jul 2026 (item 58.2), page256 · 15 July 2026

    Ranavadi PSP · EAC 58th meeting minutes, 15 Jul 2026 (item 58.2)

Sources

Confidence: verified