Corrections

Every number on this site comes from a document I can point to:

Spotted a mistake, or have a document I should see? Write to daredavil239804@gmail.com with the page, the claim and, if you can, a source. I reply within 7 days and note every fix on the page.

Email a correction

Share this page

Please check the linked source before you forward a figure.

← All projects

Tarali PSP

Environmental clearance granted (as of 18 June 2025) · Adani Green

1,500MW

Not disclosedtrees to be felled

0ha of forest land

  1. MoU signed
  2. Study terms (ToR)
  3. Environment clearance
  4. Construction
  5. Operating
Forest (ha) 0 Documented“Forest Land : 0 ha”Tarali EC, page13
Total land (ha) 150.74 Documented“Tarali Open Loop Pumped Storage Project (1500 MW) in an area of 150.74 Ha located at Village”Tarali EC, page1
Capacity (MW) 1,500 Documented“xii No. of Affected Families As the Tarali PSP (1500 MW) will come into”Tarali EC, page21
Storage (GWh) 9.75 (estimate) DocumentedDerived on this site“demand of about 6.5 hours with an estimated annual energy generation of 3365.48 MU.”1,500 MW × 6.5 h = 9.75 GWh.Tarali EC (Adani Green Energy), page14
Location17.5076°N, 73.8889°E (exact)Documented“Upper Dam: Longitude - 73°53'19.97"E Latitude - 17°30'27.38"N”Tarali EC, page13
DistrictSatara, Patan
MoU signed28 June 2022

Notes

  • Layout revised from 63.10 ha forest at original Terms of Reference (ToR) The list of studies an EIA must cover, set by the expert committee. Getting a ToR is the first clearance step, not a permission to build. More in glossary → to 0 ha: shows siting changes outcomes.
  • Storage is our estimate: 1,500 MW for 'about 6.5 hours' of daily generation ( Environmental clearance (EC) The environment ministry's permission for a project, given after the EIA and public hearing, with conditions attached. More in glossary → ).

Timeline

Category
  1. · MoU signed, no clearance yet ReportedNot yet reviewed #

    Adani Green signs Memorandum of understanding (MoU) A non-binding agreement between the state and a developer to study and build a project at a site, with a water allocation. More in glossary → for five Maharashtra PSPs

    Details and documents

    Includes Tarali, Warasgaon–Warangi and Patgaon; ~₹60,000 crore.

    Tarali PSP · Warasgaon–Warangi PSP · Patgaon PSP · Adani Watch

What lives here

Sacred pools, temple forests and community fish sanctuaries Reported

Western Ghats / Sahyadri The 1,600 km mountain chain along India's west coast: older than the Himalaya, a UNESCO World Heritage site and a global biodiversity hotspot. More in glossary → PSPs threaten Devrai (sacred grove) Patches of old forest protected by villages for a local deity; often the last old-growth trees in a valley. More in glossary → , sacred river origins and community-protected fish pools.

Sources

Confidence: verified