Every number on this site comes from a document I can point to:
Official papers first: Terms of Reference, clearance letters, Expert Appraisal and Forest Advisory Committee minutes, EIA reports, forest orders, gazettes and Central Electricity Authority records, mostly from the Parivesh portal.
News second: only from a fixed list of outlets (see About), summarised in my own words.
Every claim is labelled documented, reported, alleged (always with who alleges it) or official claim. The ⓘ beside a number shows the page and sentence it comes from.
Daily updates are added automatically and marked "not yet reviewed" until an editor checks them.
When sources disagree, I show both figures side by side.
Spotted a mistake, or have a document I should see? Write to daredavil239804@gmail.com with the page, the claim and, if you can, a source. I reply within 7 days and note every fix on the page.
Please check the linked source before you forward a figure.
Independent and unfunded. Every number links to its source: please check it before you share. Allegations are marked and attributed. Terms & disclaimer ·
1,500 Reported“Subject: Submission against 1500 MW Warasgaon Warangi Pumped Storage Project by Adani Green Energy to be discussed in the 19th EAC meeting for TORs”SANDRP letter to EAC · 29 November 2024
88.98 ha was the Sep 2024 amendment the EAC rejected; 90.00 ha is the fresh ToR of Dec 2024. An earlier '80.03 ha' figure is not in these minutes and was dropped.
Notes
Rejected 27 Sep 2024 after forest land rose from 24.50 to 88.98 ha; fresh Terms of Reference (ToR)The list of studies an EIA must cover, set by the expert committee. Getting a ToR is the first clearance step, not a permission to build.More in glossary → 31 Dec 2024 (Expert Appraisal Committee (EAC)The central committee of experts that recommends ToR and EC for river valley and hydro projects, including PSPs.More in glossary → 21st minutes) for 226.16 ha, of which 90.00 ha is forest.
Warangi is in the Western Ghats Ecologically Sensitive Area (ESA)About 56,825 sq km of the Western Ghats proposed for protection since 2014; still only a draft, reissued six times.More in glossary →.
Rejected Warasgaon–Warangi Pumped storage project (PSP)Two reservoirs at different heights: water is pumped up when power is cheap and released through turbines when power is needed.More in glossary → gets fresh ToR three months later
Details and documents
After rejection in September, Adani's project returned with a new application and received ToR. Its Warangi village lies in the draft ESA.
EAC rejects Warasgaon–Warangi amendment as forest need triples
Details and documents
Forest land required rose from 24.50Documented“…ra’s fragile Western Ghats. The committee raised concerns over the drastic increase in forest land required for the project, from 24.50 hectares to 88.98 hectares, more than three times the original estimate. Advertisement The committee has instructed Adani to…”Tribune to 88.98 haDocumented“…rn Ghats. The committee raised concerns over the drastic increase in forest land required for the project, from 24.50 hectares to 88.98 hectares, more than three times the original estimate. Advertisement The committee has instructed Adani to reapply with a pro…”Tribune. The committee asked Adani to reapply with lower impact.
· MoU signed, no clearance yet ReportedNot yet reviewed#
Adani Green signs Memorandum of understanding (MoU)A non-binding agreement between the state and a developer to study and build a project at a site, with a water allocation.More in glossary → for five Maharashtra PSPs
Details and documents
Includes Tarali, Warasgaon–Warangi and Patgaon; ~₹60,000 crore.
Cumulative impact assessmentA study of the combined effect of all projects in one river basin or landscape, rather than one project at a time.More in glossary → and carrying-capacity studies show what many projects do to one basin together.
⚠️ What happened
None exists for the Kal, Savitri, Pej, Kalu or Koyna basins. Pane's upper dam is ~3 kmDocumented“· Upper Adani Dam is barely 3 kms from the proposed Upper Dam of 1500 MW Pane Pumped Storage by JSW.”SANDRP: letter to the EAC on the Adani dams · 29 November 2024 from Warasgaon's; residents say more projects are planned within 15–20 km of Karjat.
Sacred pools, temple forests and community fish sanctuariesReported
Western Ghats / SahyadriThe 1,600 km mountain chain along India's west coast: older than the Himalaya, a UNESCO World Heritage site and a global biodiversity hotspot.More in glossary → PSPs threaten Devrai (sacred grove)Patches of old forest protected by villages for a local deity; often the last old-growth trees in a valley.More in glossary →, sacred river origins and community-protected fish pools.